POWER SITUATION UPDATE 30 APRIL 2019 (as of 10:30 AM)

GRID STATUS:         YELLOW from 1100-1600H (10:01 AM - 4:00 PM) intervals
LUZON POWER PLANT OUTAGES/DERATED
As of 10:30 AM, 30 April 2019, Tuesday

Forced Outage (due to Earthquake)

Power Plant

Installed Capacity (MW)

Dependable Capacity (MW)

Cause

Date Out

Estimated Date In

GNPower Mariveles Power  Ltd. (GMPC) U2

345

316

Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake

22-Apr-2019

2-May-2019

SMC Consolidated Power Corporation (SMCCPC)

Limay U1

150

135

Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake

22-Apr-2019

30-Apr-2019

SMC Consolidated Power Corporation (SMCCPC)

Limay U2

150

135

Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake

22-Apr-2019

30-Apr-2019

Total

645

586

 

 

 

 

Unplanned/Forced Outage

Power Plant

Installed Capacity (MW)

Dependable Capacity (MW)

Cause

Date Out

Estimated Date In

SEM-Calaca Power Corporation (SCPC)

Calaca U2

300

200

Boiler Tube Leak

28-Apr-2019

4-May-2019

Total

300

200

 

 

 

 

De-rated/Reduced Capacity

Power Plant

Installed Capacity (MW)

Declared Capacity (MW)

Derating/ Reduced Capacity (MW)

Cause

TeaM Energy Corporation (TEC) Pagbilao U1

382

300

82

Boiler feed pump problem

Pagbilao Energy Corporation (PEC) Pagbilao U3

420

240

180

Boiler condition under assessment

Total

 

 

262

 

Source: NGCP, concerned power plants

TBD – To be determined