Forced Outage (due to Earthquake) |
|||||
Power Plant |
Installed Capacity (MW) |
Dependable Capacity (MW) |
Cause |
Date Out |
Estimated Date In |
GNPower Mariveles Power Ltd. (GMPC) U2 |
345 |
316 |
Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake |
22-Apr-2019 |
2-May-2019 |
SMC Consolidated Power Corporation (SMCCPC) Limay U1 |
150 |
135 |
Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake |
22-Apr-2019 |
30-Apr-2019 |
SMC Consolidated Power Corporation (SMCCPC) Limay U2 |
150 |
135 |
Isolated due tripping of Transmission line caused by 6.1 magnitude earthquake |
22-Apr-2019 |
30-Apr-2019 |
Total |
645 |
586 |
|
|
|
Unplanned/Forced Outage |
|||||
Power Plant |
Installed Capacity (MW) |
Dependable Capacity (MW) |
Cause |
Date Out |
Estimated Date In |
SEM-Calaca Power Corporation (SCPC) Calaca U2 |
300 |
200 |
Boiler Tube Leak |
28-Apr-2019 |
4-May-2019 |
Total |
300 |
200 |
|
|
|
De-rated/Reduced Capacity |
||||
---|---|---|---|---|
Power Plant |
Installed Capacity (MW) |
Declared Capacity (MW) |
Derating/ Reduced Capacity (MW) |
Cause |
TeaM Energy Corporation (TEC) Pagbilao U1 |
382 |
300 |
82 |
Boiler feed pump problem |
Pagbilao Energy Corporation (PEC) Pagbilao U3 |
420 |
240 |
180 |
Boiler condition under assessment |
Total |
|
|
262 |
|
TBD – To be determined