Power Situation Update 17 April 2019 (as of 12:30 PM)

I. Grid Condition Issuances

The NGCP issued a NORMAL CONDITION for the Luzon Grid today. 

A normal condition for the system means there will be no power interruptions.

II. Forced Outages and Derated Plants

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

* Any additional forced outage or de-ration of plants will worsen the situation, while more participation in the ILP or efficiency in the use of electricity by the consumers will help the system. 

The DOE will continue to update the public on further developments. 

GRID STATUS: NORMAL

LUZON POWER PLANT OUTAGES/DERATED

As of 12:30 PM, 17 April 2019, Wednesday

Unplanned/Forced Outage

Power Plant

Installed Capacity (MW)

Cause

Date Out

Estimated Date In

SMC Consolidated Power Corporation (SMCCPC) Limay U2

150

Boiler tube leak

11-Apr-2019

18-Apr-2019

Southwest Luzon Power Generation Corporation (SLPGC) U2

150

Vibration in Primary Air Fan

07-Apr-2019

21-Apr-2019

Total

300

 

 

 

 

De-rated/Reduced Capacity

Power Plant

Installed Capacity (MW)

Declared Capacity (MW)

Derating/ Reduced Capacity (MW)

Cause

SEM-Calaca Power Corporation (SCPC) Calaca U2

300

200

100

Half condenser operation

Total

 

 

100

 

 

Source: NGCP, concerned power plants

TBD – To be determined

###