I. Grid Condition Issuances
The NGCP issued a NORMAL CONDITION for the Luzon Grid today.
A normal condition for the system means there will be no power interruptions.
II. Forced Outages and Derated Plants
Please refer to the table for the updated list of power plants that are derated and on forced outage.
* Any additional forced outage or de-ration of plants will worsen the situation, while more participation in the ILP or efficiency in the use of electricity by the consumers will help the system.
The DOE will continue to update the public on further developments.
GRID STATUS: NORMAL
LUZON POWER PLANT OUTAGES/DERATED
As of 12:30 PM, 17 April 2019, Wednesday
Unplanned/Forced Outage |
||||
Power Plant |
Installed Capacity (MW) |
Cause |
Date Out |
Estimated Date In |
SMC Consolidated Power Corporation (SMCCPC) Limay U2 |
150 |
Boiler tube leak |
11-Apr-2019 |
18-Apr-2019 |
Southwest Luzon Power Generation Corporation (SLPGC) U2 |
150 |
Vibration in Primary Air Fan |
07-Apr-2019 |
21-Apr-2019 |
Total |
300 |
|
|
|
De-rated/Reduced Capacity |
||||
Power Plant |
Installed Capacity (MW) |
Declared Capacity (MW) |
Derating/ Reduced Capacity (MW) |
Cause |
SEM-Calaca Power Corporation (SCPC) Calaca U2 |
300 |
200 |
100 |
Half condenser operation |
Total |
|
|
100 |
|
Source: NGCP, concerned power plants
TBD – To be determined
###