TASK FORCE ON ENERGY RESILIENCY UPDATE NO. 1 ON TAAL VOLCANO ERUPTION

13 January 2020 
(as of 7:00AM) 
 
TAGUIG CITY – The Department of Energy (DOE) is closely coordinating with the National Disaster Risk Reduction and Management Operations Center, as well as all the members of the energy family for subsequent updates and information pertinent to the status of energy facilities and systems, or any other emerging problem that may affect energy supply in concerned areas.
 
I.POWER SECTOR
 
A. GENERATION
1. The National Power Corporation (NPC) has no Power Plant in the area except for a SPUG in Tingloy, Batangas.
 
Actions Taken: NPC is currently coordinating with their personnel on the ground.
 
2. Ilijan Power Plant (Batangas) is still operating at full capacity.
 
B. TRANSMISSION
 
The National Grid Corporation of the Philippines (NGCP) is implementing contingency measures, as it continues monitoring the effects of the volcanic activity of Taal Volcano to transmission facilities.
 
As of 6:30 PM today (12 January), multiple trippings of the following Lines:
Dasmarinas-Ilijan 500kV Line
Tayabas-Dasmarinas 500kV Line
San Jose-Tayabas 500kV Line 2
4x600MVA DasmarinasTransformers
 
Cause: Line fault due to reported Taal Volcano eruption at 1535H.
 
Actions Taken: 
on-going switching and restoration of lines
restored Sta. Rita-San Lorenzo 230kV Tie-Line
declared Market Intervention for interval 1900H
first attempt at Dasmarinas-Ilijan 500kV Line failed at 1810H.
 
C. DISTRIBUTION
 
The National Electrification Administration (NEA) has advised all concerned electric cooperatives to take all appropriate contingency measures to mitigate the impact on electric services to consumers, activate the Emergency Restoration Organization, when needed to immediately implement emergency restoration plan and continuously monitor the situation.
 
Batangas II Electric Cooperative, Inc. (BATELEC II)
EC Substation Affected: Talaga and Laurel Substations 
 
Feeder Affected:
TALAGA 
F1 -Talisay/portion of Tanauan
F2 – Tanauan
 
LAUREL
All feeders
 
Municipality/City Affected: 
Tanauan
Talisay
Laurel
 
Cause of Power Interruption: 
volcanic eruption
series of earthquake
ash fall, lava mud and rocks affecting sub-transmission and distribution facilities
 
Date & Time Power Went-Off : 12 January 2020 at 1611H
 
Date & Time Power Restored: To be determined. On-going ash fall and mud showers within the area.
 
II. OIL SECTOR
1. Shell
refinery is business-as-usual
continuous monitoring
7 stations within 6-35 km raduis of Taal are currently closed down for safety of staff
 
2. Petron
terminals in Batangas and Cavite are not affected
 
3. Petro Gazz
as of 6:30 PM, Gazz Silang Cavite and Gazz Lipa City are closed
 
4. South Pacific Inc.
terminal not affected. 
Personnel are currently monitoring the situation
 
5. Insular Oil
Batangas operations on alert
terminal has no operations on Sundays
alternate source in case of closure will be Subic, Bataan or Manila
 
6. Chevron
business-as-usual
continuous monitoring
 
7. SEAOIL
as of 6:00 PM, Agoncillo, Lalaan, Mendez, Carmona and Canlubang stations are closed for the safety of staff
 
Subsequent updates will be made as soon as the information becomes available. 
 
Rest assured that the entire energy family will keep the public properly informed on the matter.
 
###