POWER SITUATION UPDATE
(as of 1:15 PM)
I. Grid Condition Issuances
The NGCP issued a NORMAL CONDITION for the Luzon Grid today.
A normal condition for the system means there will be no power interruptions.
II. Forced Outages and Derated Plants
Please refer to the table for the updated list of power plants that are derated and on forced outage.
Power Plant | Installed Capacity (MW) | Cause | Date Out | Estimated Date In |
Total | 0 |
Power Plant | Installed Capacity (MW) | Declared Capacity (MW) | Derating/Reduced Capacity (MW) | Cause |
SEM-Calaca Power Corporation (SCPC) Calaca U2 |
300 | 200 | 100 | Half condenser operation |
Pagbilao Energy Corporation (PEC) Pagbilao U3 |
420 | 192 | 228 | Boiler condition under assessment |
Total | 328 |
Source: NGCP, concerned power plants
TBD - to be determined
* Any additional forced outage or de-ration of plants will worsen the situation, while more participation in the ILP or efficiency in the use of electricity by the consumers will help the system.
The DOE will continue to update the public on further developments.
###